The piles verticality and duration must also be monitored and documented. A exam pile is constructed at the start with the work and load tested to 200% of the look load in accordance Using the common specification ASTM D 1143. Analysis of your complete cross-area and the entire duration with https://backlink60369.blogspothub.com/34404274/micropile-for-dummies